PROJECT NAME | Bridge over the Fenekgraben near Unterwart – object 18045 |
SERVICES | structural design, general design, detailed design, quantity take-off |
PLANNING PERIOD | 06.2020 – 06.2021 |
OWNER | State Burgenland – Department 5 – Building Department Bridge Construction Unit |
Three different traffic ways cross the bridge over the Fenekgraben near the industrial estate in Unterwart. In the middle, the B63a federal road runs on an embankment, with the upper edge of the carriageway approximately 4.50m above the bottom of the trench. An accompanying minor road is located to the north of the federal road and a cycle track to the south. All three traffic ways are crossing the bridge on the same level above the bridges upper edge.